Description: New, but have some markings on them on one side of the connector (see pictures). 5 pieces as pictured. Each one has 10 ft. leads 20 AWG (0.032")
Price: 34.99 USD
Location: Albuquerque, New Mexico
End Time: 2024-08-29T00:36:17.000Z
Shipping Cost: N/A USD
Product Images
Item Specifics
All returns accepted: ReturnsNotAccepted
Brand: OMEGA
Lead Length: 120"
MPN: Type K Male Mini Thermocouple
Thermocouple Type: K